Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1990
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Mar 22, 2023     Cowling - (4 hours)       Category: Engine
Sanded top cowling gaps. Located and installed remaining clecoes in top cowling rear edge. Located fasteners on top/bottom cowl mating line. Laid out oil access door location. Marked for cutting and drilling. I will use the Avery hidden hinge on the oil door instead of the hinge provided in the kit. The Avery hinge in much stronger and is spring loaded. Also, reamed out rear spar mounting location and pre-installed required hardware. Measured for cut line of front spar attach 'dog bone'.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.